Gallery
Installation takes place on the 4th floor parking deck. This was a logistical challenege requiring all equipment to be shuttled up the low height clearance parking deck. Numerous trips were made using small framed flatbed pickup trucks.
Installing the tent 1 |
Installing the tent 2 |
Installing the tent 3 |
Installing the tent 4 |
Installing the tent 5 |
shuttle equipment to roof |
Installing the tent 6 |
Installing the tent 7 |
Installing the tent 8 |